Terms and Conditions:

Concrete by Bayleaf will not accept responsibility for damages to services eg. Water, Gas, Electricity which arise due to noncompliance with building regulations e.g. such as minimum depth

No Vehicles are to be driven on new concrete for 7 days, any damage occurring from such circumstances will be repaired at the owners expense

After concrete is poured it is to remain untouched until cut and sealed, and remain untouched for a further 24 hours after being sealed

Coloured concrete can be colour sealed as an optional extra. Colour sealing is charged at $6.00 a square metre

Exposed aggregate concrete is clear sealed with 2 coats of a solvent based sealer, if the client requests further coats of sealing this is charged at $6.00. a square metre

Exposed aggregate is a completely raw material composed of sands and stones which may vary in appearance depending on quarry and time of year, the client fully accepts that the concrete used may not be exactly the same as samples and reference photos.

Council requires no reinforcement of Assets such as Crossovers as a result there is.a greater chance of concrete cracking, control joints are placed in the concrete to persuade the concrete to crack along the control joins, if concrete cracks Concrete By Bayleaf will not be held responsible.

Concrete is a raw material, and due to environmental conditions and land movement, concrete can crack. Concrete by Bayleaf uses expert workmanship to create joins or saw cuts to persuade the concrete to crack along the control joins. Concrete by Bayleaf will not accept responsibility for hair line cracks which may appear.

Pricing for excavation are a firm estimate only, this assumes there are no major tree roots or stumps below ground. On excavation, if we encounter unforeseen tree roots or stumps which require hand digging and removal, an hourly rate of $50 plus GST per man and per hour, will be incurred for time taken to remove the roots.

Payment terms are:

  • 15% deposit to secure our work
  • 35% to be paid prior to concrete pour
  • 50% within 7 days of completion of pour

We thank you for your business, Anton Bialylew Director Concrete by Bayleaf